INFRASTRUCTURE Print

A. Road

The length of Road in North Sumatera was 33,963,176 km in 2009

No. Road Status Length (km) 
 1. State Road 2,098,050 
 2. Provincial Road 2,752,500 
 3. Regency/Municipality Road 29,112,617 

Road Development Plan :

  1. Development of Medan Binjai Toll Road (+16 km) and Tanjung Morawa - Tebing Tinggi Junction Kuala Namu (+60 km) Toll Road.
  2. Development of Lake Toba Outer Ring Road.
  3. Development of Beach Side Road.
  4. Development of Tanjung Morawa - Saribu Dolok - Tongging Road (+90 km)


B. Railway Networks

The length of railway was 556,349 km, of which 480,699 km was being operated with rail type configuration R-25 (42.92%), R-42 (35.52%), and R-33 (21.56%).

Available Railway Networks: Belawan - Medan - Tebing Tinggi - Kisaran - Rantau Prapat, Medan - Tebing Tinggi - Pematang Siantar, Medan - Kisaran - Tanjung Balai.

Railway Development Plan : 

Development of Railway Networks as follows :
Medan - Aras Kabu - Kuala Namu.

Improvement of Railway Networks :
Aceh Boundary - Binjai - Medan - Tebing Tinggi - Kisaran - Rantau Prapat.

Tebing Tinggi - Pematang Siantar and Kisaran - Tanjung Balai.

Reopening of Railway Network of Besitang - Langsa - Lhokseumawe - Banda Aceh +485 km (to support the Trans Sumatera Railway Project Plan).

East Coast Region

  1. Reopening of Railway Network of Medan - P. Brandan -  Besitang + 100 km.
  2. Rantau Prapat - Pinang Municipality + 62 km.
  3. Binjai - Hamparan Perak - Belawan - Kuala Namu - Lubuk Pakam + 65 km.

West Coast Region

  1. Kota Pinang - Langga Payung - Gunung Tua - Padang Sidempuan +120 km.
  2. Padang Sidempuan - Lumut - Sibolga +60 km.
  3. Gunung Tua - Binanga - Sosa - Bukit Tinggi +295 km.


C. Airports

 Airport Size (m2) Apron (m2)
 Polonia, Medan 2,950 x 45 49.455
 Dr. F.L. Tobing,
 Cental Tapanuli Regency
 1,710 x 30 50 x 95 = 4.750
 Pinang Sori,
 Sibolga Municipality
 1,400 x 30 -
 Binaka,
 Gunung Sitoli Municipality
 1,350 x 50 40 x 60 = 2.400
 Aek Godang,
 South Tapanuli Regency
 1,400 x 23 32.5 x 58.5 = 12.901
 Lahondre,
 Pulau-Pulau Batu
 850 x 23 25 x 50 = 1.250
 Sibisa, Parapat 750 x 23 40 x 60 = 2.400
 Silangit, Siborong-borong 900 x 23 40 x 60 = 2.400


Airport Development Plan : 

  1. Development of Kuala Namu New Airport in Deli Serdang Regency. 
  2. Improvement of Pioneering Airports in the Regencies/Municipalities of North Sumatera, e.g. Aek Godang F.L.Tobing, Binaka, Silangit, Sibisa.
  3. Development of Pioneering Airports in the Regencies of Mandailing Natal, Labuhan Batu and Tanjung Balai.

 
D. Seaports

Cargo Traffic Based on Seaports (Ton) in Year 2009 : 

  Seaport  International Inter-Island 
 Unloading Loading Unloading Loading
 Belawan 2,192,030  4,505,600 6,680.043 474,127 
 Sibolga -  8,246  490,345  589,333 
 Tanjung Balai 231,045  188,265  1,751  1,747 
 Pangkalan Brandan
 Pangkalan Susu
 -   -   -   - 
 Gunung Sitoli  -   -  631,338  201,741 
 Kuala Tanjung 552,222  1,461,498  219,581  90,472 
 TOTAL 2,975,297  6,163,609  8,023,058  1,357,420 

 
Seaport Development Plan :

Improvement of Belawan Seaport (Master Plan has been devised in the Year 2009) and other Seaports, e.g. Teluk Nibung, Bagan, Asahan, Labuhan Angin, Sibolga etc.


E. Regional Expansion 

Currently available Industryal Regions are: Medan Industrial Region (Kawasan Industry Medan/KIM) I & II and Star Industrial Region in Tanjung Morawa.

Regional Expansion Plan :

  1. KEKI ---> Kawasan Ekonomi Khusus Investment (Special Investment Economic Region, consisting of: Medan - Deli Serdang, Serdang Bedagai, Asahan, Tanjung Balai, Sibolga and Central Tapanuli.
  2. National Strategic Regions: Medan, Binjai, Deli Serdang and Karo (Mebidangro).
  3. Danau Toba Region.
  4. Bukit Barisan Highland Agropolitan Regions (9 Regencies/Municipalities).
  5. Agromarinepolitan Regions (16 Regencies/Municipalities).


F. Power Plants

- Install capacity :  1,299.54 MW
- Average capacity at peak load : 980 MW
- Electricity demand : 1,070 MW
- Electricity Deficit : 100 - 150 MW


Additional Capacity Plan of Power Plants up to the year 2011 is 1,938.2 MW.


G. G a s

- Supply capacity : 36 mmscfd 

- Demand  

 : 54 mmscfd 
  PLN (National Electricity Company) : 42 mmscfd 
  PGN (National Gas Company) : 12 mmscfd 
- Deficit : 18 mmscfd 
- Additional Demand : 104 mmscfdÂ